ON THE BOARDS

 
chan_zuckerber_init.png

Chan Zuckerberg Initiative

MEYERS+ is providing mechanical, electrical, plumbing and fire protection engineering services in collaboration Bohlin Cywinski Jackson and CBRE. The project includes interior fit out of two Redwood City office buildings.

 
 
San Francisco Flower Mart.jpg

San Francisco Flower Mart

MEYERS+ is providing mechanical, electrical, plumbing and fire protection engineering services in collaboration with Rios Clementi Hale Studios, Adamson Associates and Kilroy. The project includes commercial office, retail and space for the rebuilt Flower Mart. 

 
 
SierraPoint2.jpg

Sierra Point, South San Francisco

MEYERS+ is providing mechanical, electrical, plumbing and fire protection engineering services in collaboration with HCP, PMA and DES. The project includes a multi-phase development of biotech/office buildings. 

 
 
Hunters Point Shipyard Green Room Pavilions.jpg

Hunters Point Shipyard Green Room Pavilions

MEYERS+ is providing mechanical, electrical, plumbing and fire protection engineering services in collaboration with Adjaye Associates and YAMAMAR Design. The project includes two pavilion buildings that will flank a new ten-acre park for the new Hunters Point Shipyard Development.

 
 
CCA.jpg

California College of the Arts

MEYERS+ is providing mechanical, electrical, plumbing and fire protection engineering services in collaboration with Studio Gang. The project includes the master plan and expansion of the existing San Francisco campus.

 
 
633folsom.jpg

633 Folsom Street

MEYERS+ is providing mechanical, electrical, plumbing and fire protection engineering services in collaboration with The Swig Company and Gensler. The project includes the expansion and recladding of the existing office building.

 
 
Hearst-Building-San-Francisco-1FT.jpg

Hearst Building Conversion

MEYERS+ is providing mechanical, electrical, plumbing, fire protection engineering services in collaboration with Forge Architects. The project includes the conversion of the existing historic office building to hotel occupancy.

 
 
Alaska Airlines at SFO Terminal 2.png

Alaska Airlines at SFO Terminal 2

MEYERS+ is providing mechanical, electrical, plumbing and fire protection engineering services in collaboration with TSAO Design. The project includes various interior development projects.

 
 
2270 Broadway_Oakland.jpg

2270 Broadway, Oakland

MEYERS+ is providing mechanical, electrical, plumbing and fire protection engineering services in collaboration with Handel Architects and Hines. The residential tower will include 223 units, above grade parking decks, and rooftop amenities.

 
 
Macys Union Square.jpg

Macy’s Union Square

MEYERS+ is providing mechanical, electrical, plumbing, fire protection engineering services in collaboration with Macy’s West and KA Architects. The project includes various interior renovation projects.

 
 
1721 Webster Street, Oakland.jpg

1721 Webster Street, Oakland

MEYERS+ is providing mechanical, electrical, plumbing and fire protection engineering services in collaboration with Holland Partner Group and SCB Architects. The 23-story residential tower will include 250 units, residential amenity spaces and 4 levels of below grade parking.

 
 
Talking Stick Resort Arena Master Plan.jpg

Talking Stick Resort Arena Master Plan

MEYERS+ is providing mechanical, electrical, plumbing, fire protection engineering services in collaboration with HOK. The project includes a concept master plan of potential renovations to the existing arena in Phoenix, Arizona.

 
 
Jack-London-Square-Parcel-F2-Rendering-West.jpg

Jack London Square Blocks D and F2, Oakland

MEYERS+ is providing mechanical, electrical, plumbing and fire protection engineering services in collaboration with SCB Architects. The residential buildings combined will include 468 apartments, street level retail and indoor ground level parking.

 
 
genentech.jpg

Genentech Building 40

MEYERS+ is providing mechanical, electrical, plumbing, fire protection and building performance engineering services in collaboration with Woods Bagot and Genentech. We are designing the MEP/FP systems through design development for transition to design build subcontractors. 

 
 
706 Mission Street.jpg

706 Mission Street

MEYERS+ is providing electrical engineering services in collaboration with Cupertino Electric. We are the electrical engineer of record for this luxury residential high rise building designed by Handel Architects and being built by Webcor. The project includes the historic renovation of the existing Aronson building which will become the new home of the Mexican Museum.

 
 
San-Jose-airport.jpg

Mineta San Jose International Airport

MEYERS+ is providing mechanical, electrical, plumbing and fire protection engineering services in collaboration with Gensler. The project includes on-call design services for multiple projects at Mineta San Jose International Airport.

 
 

MacArthur Transit Village

MEYERS+ is providing mechanical, electrical, plumbing and fire protection engineering services in collaboration with SCB Architects and Boston Properties. The residential high-rise building will include 403 residential units and street level retail. The project will be adjacent to the MacArthur BART Station.

 
 

Airbnb at 999 Brannan Street

MEYERS+ is providing electrical engineer of record services in collaboration with Cupertino Electric and WRNS Studio. The project includes the renovation of the core & shell systems and tenant interiors for 4 floors at 999 Brannan Street.

 
 

2177 Third Street

MEYERS+ is providing mechanical, electrical, plumbing and fire protection engineering services in collaboration with Woods Bagot. The residential high-rise building will include 114 residential units and street level retail on 3rd Street, between 18th and 19th Streets in San Francisco. 

 
 

100 & 150 Hooper

MEYERS+ is providing electrical engineer of record services in collaboration with Rosendin Electric and Pfau Long Architecture. The project includes three 4-story office and PDR buildings on the site bound by Hooper, 7th and Channel Streets in San Francisco, California.

 
 

75 Howard Street

MEYERS+ is providing mechanical, electrical, plumbing and fire protection engineering services in collaboration with SOM, PMA and Broadmoor Partners. The residential building will contain 133 units and street level retail. The project also will contain 100 off-street parking spaces in two below-grade levels.

 
 

City Center Bishop Ranch

MEYERS+ is providing mechanical, electrical, plumbing and fire protection engineering services in collaboration with Renzo Piano Building Workshop, BAR Architects, and Sunset Development. 

City Center Bishop Ranch is a reinvention of the suburban shopping center model in which community, culture and commerce will converge. Located in San Ramon, City Center is 300,000 square feet of shopping, dining and entertainment, designed by Renzo Piano Building Workshop.

 
 

505 Brannan Street

MEYERS+ is providing core and shell electrical engineering services in collaboration with Sprig Electric and Heller Manus Architects.

505 Brannan Street is a new commercial office building located at Brannan and 5th Streets in San Francisco. The building will comprise 150,000 square feet and will be home to photo-sharing site Pinterest.

 
 

SFIA Air Traffic Control Tower Demolition

MEYERS+ is providing mechanical, electrical, plumbing and fire protection engineering services in collaboration Woods Bagot/AE3 Joint Venture. The project consists of the demolition of the existing control tower at San Francisco International Airport Terminal 2. The remaining building will be evaluated for other potential uses.

 
 

Mission Bay Arena Development

MEYERS+ is providing electrical engineering services in collaboration with SSR, Manica Architecture and Kendall Heaton. Our scope of work includes the two Office Towers, Market Hall and Gate House. We also are designing the fire alarm system site-wide and providing on-site field representation during construction for the arena.

 
 
San-Francisco-International-Airport-Terminal-1-Reconstruction.jpg

San Francisco International Airport Terminal 1 Center Reconstruction

MEYERS+ is providing mechanical and electrical engineering services in collaboration with Hensel Phelps/Gensler. The programming phase includes stakeholder engagement and the creation of a basis of design for the reconstruction of Terminal 1 Center at San Francisco International Airport. 

 
 

Transbay Block 9

MEYERS+ is providing electrical engineering services in collaboration with Sprig Electric. We are the electrical engineer-of-record for this 42 story residential high rise building designed by SOM/Fougeron Architecture. 

 

 
 
 
meyers_plus_only_trans5_sq.png